You may have some questions about the SB 1 signs you’re seeing on the road. Signs on state right-of-way are tied to construction and placed by the contractor when the contract is approved. Work on the project typically begins within 60 days of the contract approval. To date, contractors have installed signs at 118 highway construction sites to notify the public of roadwork ahead and to keep them informed about how SB 1 funds are being spent in their region. As has historically been the case, Caltrans aims to be as transparent as possible about how the Department is using transportation revenues. Due to the nature of the work, striping projects are not mapped on the RebuildingCA.ca.gov project map, however these important projects are part of CA’s highway safety improvements and signs are placed to alert the public of active work zone locations. Below is a current list of all SB 1 projects with signage:

Project ID Caltrans District County Route(s) Project Description Project Name Category SB 1 Sign Posted Project Status
1217000117 12 Orange 57 $7 million project will replace broken slabs and resurface concrete pavement on more than 46 lane miles of State Route 57 through the cities of Orange, Anaheim, Placentia and Fullerton. Orange 57 Pavement Project Pavement 12/18/2017 COMPLETED
0717000101 7 Los Angeles 5 $1.3 million pavement project will improve almost one lane mile of Interstate 5 between I-605/I-5 Separation and Washington Boulevard in Los Angeles County. Los Angeles 5 Pavement Project Pavement 2/20/2018 COMPLETED
0516000123 5 Santa Barbara 101 $1.4 million bridge project will revamp two bridges on U.S. Highway 101 in Santa Barbara County. Santa Barbara 101 Bridges Project Bridges 3/15/2018 COMPLETED
1018000043 10 Stanislaus 99 $2.5 million project will widen striping and increase visibility on 144 lane miles of State Route 99 from the Merced/Stanislaus County line to the San Joaquin/Stanislaus County line. Stanislaus 99 Striping Project Striping 5/9/2018 COMPLETED
1018000044 10 San Joaquin 99 $2 million project will widen striping and increase visibility on 104 lane miles of State Route 99 from SR-120/SR-99 Junction in San Joaquin County to the Sacramento/San Joaquin County line. San Joaquin 99 Striping Project Striping 4/27/2018 COMPLETED
0217000064 2 Lassen 299 $2.2 million pavement project will improve 9.4 lane miles of State Route 299 from the Shasta/Lassen County line to west of Muck Valley Hydro Road near McArthur in Lassen County. Lassen 299 Pavement Project Pavement 5/23/2018 COMPLETED
0316000237 3 Yolo 5 $1.4 million pavement project will improve 4.5 lane miles of Interstate 5 at various locations north of the city of Woodland in Yolo County. Yolo 5 RHMA Overlay Pavement Project Pavement 5/30/2018 COMPLETED
1017000096 10 San Joaquin 99 $5.6 million pavement project will repair 30 lane miles of State Route 99 from SR-4/Crosstown Freeway to Hammer Lane in San Joaquin County. San Joaquin 99 Pavement Project Pavement 5/10/2018 COMPLETED
1018000046 10 Stanislaus 5 $1.9 million project will widen striping and increase visibility on 113 lane miles of Interstate 5 from the Stanislaus/Merced County line to the San Joaquin/Stanislaus County line. Stanislaus 5 Striping Project Striping 5/7/2018 COMPLETED
0315000242 3 Butte 70 $1.7 million pavement preservation project will improve 11.2 lane miles of State Route 70 from north of Garden Drive Overcrossing to Campbell Creek Overflow Bridge north of the city of Oroville in Butte County. Butte 70 Overlay Pavement Project Pavement 5/9/2018 COMPLETED
0617000171 6 Kern 58 $2.1 million pavement replacement project will improve 12 lane miles of State Route 58 at various locations near west of McKittrick in Kern County. Kern 58 Pavement Project Pavement 6/1/2018 COMPLETED
0618000078 6 Kings/ Fresno 5 $1.8 million project will widen striping and increase visibility on 127 lane miles of Interstate 5 at various locations from the Kings/Kern County line to the Fresno/Merced County line. Kings & Fresno 5 Striping Project Striping 6/4/2018 COMPLETED
1018000047 10 San Joaquin 5 $4.9 million project will widen striping and increase visibility on 226 lane miles of Interstate 5 from the San Joaquin/Stanislaus County line to Lathrop Road in San Joaquin County, and from north of Hospital Road in San Joaquin County to the Sacramento/San Joaquin County line. San Joaquin 5 Striping Project Striping 5/20/2018 COMPLETED
0617000168 6 Fresno 63, 145, 180 $1.3 million pavement replacement project will improve 9 lane miles and repair various sections of State Route 63 near Orange Cove, State Route 145 near Westside and State Route 180 near the city of Kerman in Fresno County. Fresno 63, 145 & 180 Pavement Project Pavement 6/1/2018 COMPLETED
0618000080 6 Tulare/ Fresno/ Madera 99 $4 million project will widen striping and increase visibility on 308 lane miles of State Route 99 at various locations in the counties of Tulare, Fresno and Madera. Tulare, Fresno & Madera 99 Striping Project Striping 6/4/2018 COMPLETED
0618000081 6 Kern 5 $1.3 million project will widen striping and increase visibility on 19 lane miles of Interstate 5 at various locations in Kern County. Kern 5 Striping Project Striping 5/3/2018 COMPLETED
0418000109 4 Contra Costa/ Alameda 80 $2.7 million project will widen striping and increase visibility on 57 lane miles of Interstate 80 at various locations from Powell Street in Alameda County to Cummings Sky Overcrossing in Contra Costa County. Contra Costa & Alameda 80 Striping Project Striping 5/20/2018 COMPLETED
0617000173 6 Fresno 168 $1.7 million pavement replacement project will improve 7 lane miles of State Route 168 at various locations near the city of Clovis in Fresno County. Fresno 168 Pavement Project Pavement 6/15/2018 COMPLETED
0217000065 6 Trinity 299 $1.6 million pavement project will improve 7.3 lane miles of State Route 299 from east of Little French Creek to east of Manzanita Creek Bridge near Big Bar in Trinity County. Trinity 36 Big Bar Overlay Pavement Project Pavement 5/21/2018 COMPLETED
0315000243 3 El Dorado 50 $2.8 million pavement project will improve 13.2 lane miles of U.S. Highway 50 from Weber Creek Bridge to Carson Road Overcrossing near the city of Placerville in El Dorado County. Placerville 50 Pavement Project Pavement 5/15/2018 COMPLETED
0917000062 9 Inyo 395 $1.4 million pavement preservation project will improve 24.4 lane miles of northbound U.S. Highway 395 from State Route 168 Junction to Sunland Indian Reservation Road near the city of Bishop in Inyo County. Inyo 395 Chip Seal Pavement Project Pavement 6/1/2018 COMPLETED
0417000182 4 Solano 113 $1.8 million pavement replacement project will improve 3.3 lane miles of State Route 113 at various locations between the cities of Rio Vista and Dixon in Solano County. Solano 113 Pavement Project Pavement 6/11/2018 COMPLETED
1017000049 10 San Joaquin 5 $2.8 million bridge project will revamp three bridges on Interstate 5 in San Joaquin County. San Joaquin 5 Bridge Project Bridges 5/20/2018 COMPLETED
0917000060 9 Mono/ Inyo 395 & 89/ 395 $2.3 million pavement project will improve 51.6 lane miles of northbound U.S. Highway 395 north of Gorge Road in Inyo County, State Route 89 from US-395/SR-89 Intersection to south of Big Springs Road in Mono County, northbound US-395 from the Inyo/Mono County line to Forest Road in Mono County, US-395 from Rock Creek Road to south of South Landing Road, and from Mono Inn Drive to south of Lundy Lake Road in Mono County. Mono & Inyo 89 & 395 Chip Seal Pavement Project Pavement 6/4/2018 COMPLETED
0917000061 9 Inyo/ Mono 395 $1.3 pavement preservation project will improve 35.2 lane miles of U.S. Highway 395 at various locations in the counties of Inyo and Mono. Inyo & Mono 395 Chip Seal Pavement Project Pavement 7/13/2018 COMPLETED
1013000049 10 Tuolumne 108 $2.2 million pavement replacement project will improve 4 lane miles of State Route 108 from Lyons Dam Road to east of Long Barn Connection in Tuolumne County. Tuolumne 108 West Long Barn CAPM Pavement Project Pavement 6/22/2018 COMPLETED
0615000050 6 Kings 5 $28.5 million pavement replacement project will improve 36 lane miles of Interstate 5 from the Kern/Kings County line to south of Utica Avenue near Lost Hills. Kings 5 Lost Hills Rubber Rehab. Pavement Project Pavement 3/23/2018 CONSTRUCTION
0714000219 7 Los Angeles 138 $12.6 million pavement preservation project will upgrade pedestrian curb ramps at intersections and crosswalk, and improve 16 lane miles of State Route 138 from 30th Street East to East Avenue S in the city of Palmdale in Los Angeles County. Los Angeles 138 Pavement Preservation & ADA Curb Ramps Pavement Project Pavement 4/12/2018 CONSTRUCTION
0518000038 5 San Luis Obispo/ Monterey 101 $4.4 million project will widen striping and increase visibility on 281 lane miles of U.S. Highway 101 from the State Route 198/US-101 Separation in Monterey County to the San Benito/Santa Clara County line. San Luis Obispo & Monterey 101 Striping Project Striping 4/9/2018 COMPLETED
0518000036 5 Monterey/ San Benito 101 $4.4 million project will widen striping and increase visibility on 281 lane miles of U.S. Highway 101 from the State Route 198/US-101 Separation in Monterey County to the San Benito/Santa Clara County line. Monterey & San Benito 101 Striping Project Striping 4/9/2018 COMPLETED
0116000075 1 Humboldt 101 $3.9 million pavement project will improve 23.2 lane miles of U.S. Highway 101 from north of Boyes Creek Viaduct to north of Prairie Creek Park Undercrossing in Humboldt County. Humboldt 101 RHMA Overlay Pavement Project Pavement 5/1/2018 COMPLETED
1218000030 12 Orange 5 5.4 million project will widen striping and increase visibility on 327 lane miles of Interstate 5 from the Orange/San Diego County line to the Los Angeles/Orange County line. Orange 5 Striping Project Striping 4/26/2018 COMPLETED
0316000242 3 Sacramento 50 $10.1 million pavement project will improve 59 lane miles of U.S. Highway 50 from west of Sunrise Blvd. in Sacramento County to the El Dorado/Sacramento County line. Sacramento 50 RHMA Overlay Pavement Project Pavement 6/28/2018 CONSTRUCTION
0518000037 5 Santa Barbara/ San Luis Obispo 101 $4.9 million project will widen striping and increase visibility on 367 lane miles of U.S. Highway 101 from the Ventura/Santa Barbara County line to north of the Santa Barbara/San Luis Obispo County line. Santa Barbara & San Luis Obispo 101 Striping Project Striping 4/20/2018 COMPLETED
0413000162 4 Alameda 880 $55.2 million pavement replacement project will improve 104 lane miles of Interstate 880 from north of Fremont Boulevard Overcrossing to High Street Separation and Overhead in Alameda County. Alameda 880 CAPM Pavement Project Pavement 5/10/2018 CONSTRUCTION
0514000054 5/td> Santa Barbara/td> 1/td> $17 million pavement preservation project will construct rumble strip, upgrade guardrail and improve 42.6 lane miles of State Route 1 from the Las Cruces Interchange (U.S. Highway 101 Separation) in Santa Barbara County to the south SR-246 Junction in the city of Lompoc./td> Santa Barbara 1 Las Cruces CAPM Pavement Project/td> Pavemen/td> 5/1/2018 CONSTRUCTION
0618000077 6 Kern 5 $4.2 million project will widen striping and increase visibility on 286 lane miles of Interstate 5 at various locations in Kern County. Kern 5 Striping Project Striping 5/16/2018 COMPLETED
0318000050 3 Yolo/ Sacramento/ Placer 80 $3.6 million project will widen striping and increase visibility on 381 lane miles of Interstate 80 from the Yolo/Solano County line to Harbor Boulevard in Yolo County, I-80 from the Sacramento/Yolo County to the Placer/Sacramento County line, and I-80 from the Placer/Sacramento County line to east of the I-80/SR-174 Separation in Placer County. Yolo, Sacramento & Placer 80 Striping Project Striping 5/7/2018 COMPLETED
0318000051 3 Sacramento/ Sutter 99, 99, 51 & 50/ 99 $1.8 million project will widen striping and increase visibility on 177 lane miles of State Routes 99, 50 and 51 at various locations in Sacramento County, and SR-99 from the Sacramento/Sutter County line to the SR-99/SR-70 Separation in Sutter County. Sacramento & Sutter 50, 51 & 99 Striping Project Striping 5/7/2018 COMPLETED
0117000034 1 Humboldt 101 $12.9 million pavement project will improve 26.9 lane miles of U.S. Highway 101 from south of Kenmar Road Undercrossing to south of Loleta Drive Overcrossing near the city of Fortuna in Humboldt County. Humboldt 101 Fortuna Overlay Pavement Project Pavement 6/1/2018 CONSTRUCTION
0418000110 4 Solano 80 $5 million project will widen striping and increase visibility on 220 lane miles of Interstate 80 from the Yolo/Solano County line to the Carquinz Bridge in Solano County. Solano 80 Striping Project Striping 5/25/2018 COMPLETED
0617000169 6 Kern/ Tulare 99, 190 $5.4 million pavement replacement project will improve 71 lane miles of State Route 99 at various locations between the cities of McFarland and Delano in Kern County, and State Route 190 near Porterville in Tulare County. Kern & Tulare 99 & 190 Pavement Project Pavement 6/5/2018 COMPLETED
0818000030 8 San Bernardino/ Riverside 15 $18.6 million project will widen striping and increase visibility on 1,254 lane miles of Interstate 15 from the Riverside/San Bernardino County line to the California/Nevada State line, and from the Riverside/San Diego County line to the Riverside/San Bernardino County line. San Bernardino & Riverside 15 Striping Project Striping 5/16/2018 CONSTRUCTION
0517000081 5 San Luis Obispo 101 $9.1 million pavement project will improve 16.2 lane miles of U.S. Highway 101 from Vineyard Drive Overcrossing in the town of Templeton to North Paso Robles Overhead in the city of Paso Robles in San Luis Obispo County. San Luis Obispo 101 Pavement Project Pavement 5/1/2018 CONSTRUCTION
1217000099 12 Orange 91 $2 million pavement project will upgrade Americans with Disabilities Act (ADA) curb ramps, improve shoulders, ramps and seven lane miles of State Route 91 at various locations from Valley View Street Overcrossing in the city of Buena Park to SR-91/SR-57 Separation in the city of Anaheim in Orange County. Orange 91 Resurface Pavement Project Pavement 6/4/2018 CONSTRUCTION
0418000111 4 Sonoma/ Marin 101 $6.1 million project will widen striping and increase visibility on 446 lane miles of U.S. Highway 101 from the Sonoma/Mendocino County line to the Marin/San Francisco County line. Sonoma & Marin 101 Striping Project Striping 6/13/2018 COMPLETED
0116000174 1 Humboldt/ Mendocino 101 $8.1 million bridge project will revamp 19 bridges on U.S. Highway 101 in the counties of Humboldt and Mendocino. Humboldt & Mendocino 101 Concrete Overlay Bridges Project Bridges 6/14/2018 CONSTRUCTION
0400020145 4 Marin 1 $6.3 million project to replace culvert with a bridge on State Route 1 south of Sir Francis Drake Boulevard near Olema in Marin County. Marin 1 Olema Creek Bridge Project Bridge 6/12/2018 COMPLETED
0617000161 6 Fresno/ Madera 99 $6.5 million pavement replacement project will improve 74 lane miles of State Route 99 at various locations in the counties of Fresno and Madera. Fresno & Madera 99 Pavement Project Pavement 6/11/2018 COMPLETED
0516000067 5 Monterey 68 $4.7 million pavement project will improve 13.7 lane miles of State Route 68 from SR-1/SR-68 Separation in the city of Monterey to SPCA Road near the Laguna Seca Race Track in Monterey County. Monterey 68 Pavement Project Pavement 6/1/2018 CONSTRUCTION
1117000149 11 San Diego 805, 5 $6.5 million pavement project will improve 28 lane miles of Interstate 805 between the cities of San Diego and National City, and I-5 between the San Ysidro Port and the city of Chula Vista in San Diego County. San Diego 805 & 5 Slab Repair & Replace Pavement Project Pavement 6/4/2018 COMPLETED
0316000246 3 Colusa/ Glenn/ Sutter/ Yuba/ Sacramento 5/ 5/ 20 & 99/ 65/ 80 $1.8 million bridge project will revamp nine bridges on Interstate 5, I-80 and State Routes 20, 99 and 65 in the counties of Colusa, Glenn, Sacramento, Sutter and Yuba. Colusa, Glenn, Sutter, Yuba & Sacramento Revamp Bridges Project Bridges 7/9/2018 COMPLETED
1017000077 10 San Joaquin 5 $3.9 million pavement project will repair and replace 83.6 lane miles of Interstate 5 from Hammer Lane in the city of Stockton to the San Joaquin/Sacramento County line. San Joaquin 5 Pavement Project Pavement 5/24/2018 COMPLETED
0317000078 3 El Dorado/ Nevada/ Placer 50/ 20 & 89/ 80 $4.5 million bridge project will revamp eight bridges on U.S. Highway 50, State Route 20, Interstate 80 and SR-89 in the counties of El Dorado, Nevada and Placer. El Dorado, Nevada & Placer Bridges Project Bridges 6/27/2018 CONSTRUCTION
1016000157 10 Merced 5/ 152 $4.7 million bridge project will revamp 18 bridges on Interstate 5 and State Route 152 in Merced County. Merced 5 & 152 Bridges Project Bridges 5/8/2018 COMPLETED
1016000198 10 Merced/ Stanislaus 5 $5 million bridge project will revamp 20 bridges on Interstate 5 in the counties of Merced and Stanislaus. Merced & Stanislaus 5 Bridges Project Bridges 5/8/2018 CONSTRUCTION
0415000155 4 Sonoma 116 $2.8 million pavement project will improve 9.2 lane miles of State Route 116 from east of Cooper Road near the city of Sebastopol to east of Gilchrist Road in Sonoma County. Sonoma 116 Pavement Project Pavement 5/28/2018 COMPLETED
1115000183 11 San Diego 116 $12 million drainage project will repair culverts along Interstate 5 at various locations from north of Lomas Santa Fe Drive Undercrossing to north of Agua Hedionda Lagoon Bridge in San Diego County. San Diego 5 Culvert Rehab. Project Pavement 6/11/2018 CONSTRUCTION
0516000122 5 Monterey 1 $4.3 million bridge project will revamp eight bridges on State Route 1 in Monterey County. Monterey 1 Bridges Project Bridges 6/11/2018 CONSTRUCTION
0717000087 7 Los Angeles 1 $6.8 million pavement preservation project will improve 100 lane miles of State Route 1 between the cities of Long Beach and Hermosa Beach. Los Angeles 1 Pavement Project Pavement 6/8/2018 CONSTRUCTION
0417000192 4 Solano 505 $12.1 million pavement project will improve 42.2 lane miles of Interstate 505 from I-80 near the city of Vacaville to the Yolo/Solano County line near the city of Winters. Solano 505 Pavement Project Pavement 7/9/2018 CONSTRUCTION
0816000031 8 Riverside 10/ 111/ 86 $17.4 million pavement project will replace and repair 149 lane miles of Interstate 10 from west of Jefferson Street to Polaris Wash in the city of Indio in Riverside County, State Route 111 from Lincoln Street to SR-86 near the community of Mecca in Riverside County, and SR-86 from the Riverside/Imperial County line to I-10/SR-86 Junction in Riverside County. Riverside 10, 111 & 86 Pavement Project Pavement 6/19/2018 CONSTRUCTION
0815000077 8 San Bernardino 10, 210, 66 $15.5 million pavement project will improve the shoulders, drainage, guardrail and 67.5 lane miles of Interstate 10 at various locations from the city of Ontario to the city of Redlands, State Route 210 at various locations from the city of Rancho Cucamonga to the city of San Bernardino, and SR-66 from Pepper Avenue to 6th Street in the city of San Bernardino in San Bernardino County. San Bernardino 10, 210 & 66 Pavement Project Pavement 7/1/2018 CONSTRUCTION
1117000170 11 San Diego 78 $12.5 million pavement project will improve 71 lane miles of State Route 78 from Flora Vista Drive in the city of Escondido to West Haverford Road in the community of Ramona, and from east of Magnolia Avenue to Wynola Road in San Diego County. San Diego 78 RHMA Overlay Pavement Project Pavement 6/11/2018 COMPLETED
1217000098 12 Orange 5 $10.6 million pavement project will improve 70 lane miles of Interstate 5 from El Camino Real Undercrossing in the city of San Clemente to north of Junipero Serra Road Undercrossing in the city of San Juan Capistrano in Orange County. Orange 5 RHMA Pavement Project Pavement 6/22/2018 CONSTRUCTION
1118000042 11 San Diego 5 $6.5 million project will widen striping and increase visibility on 237 lane miles of Interstate 5 from the United States/Mexico Border to Genesse Avenue Overcrossing in San Diego County. San Diego 5 Genesse Striping Project Striping 6/11/2018 COMPLETED
1117000160 11 San Diego 15 $4.2 million project will widen striping and increase visibility on 185 lane miles of Interstate 5 from Main Street to north of State Route 56 in San Diego County. San Diego 15 Main Street Striping Project Striping 6/11/2018 COMPLETED
1117000161 11 San Diego 15 $5 million project will widen striping and increase visibility on 281 lane miles of Interstate 15 from north of State Route 56 in San Diego County to the Riverside/San Diego County line. San Diego 15 Striping Project Striping 5/1/2018 COMPLETED
0718000054 7 Los Angeles 10 $5.7 million project will widen striping and increase visibility on 265 lane miles of Interstate 10 from E 15th Street to Puente Avenue, and from I-10/State Route 57 Separation to South College Avenue in Los Angeles County. Los Angeles 10 Striping Project Striping 6/29/2018 CONSTRUCTION
1118000043 11 San Diego 5 $9.3 million project will widen striping and increase visibility on 346 lane miles of Interstate 5 from Genesse Avenue Overcrossing in San Diego County to the Orange/San Diego County line. San Diego 5 Striping Project Striping 6/11/2018 COMPLETED
0213000008 2 Modoc 299 $3.3 million bridge project will replace the Caldwell Creek Bridge on State Route 299 in Modoc County. Modoc 299 Caldwell Creek Bridge Project Bridge 7/30/2018 CONSTRUCTION
0213000031 2 Modoc 299 $18.7 million pavement replacement project will improve 18.7 lane miles of State Route 299 from east of Caldwell Creek Bridge to west of County Road 75 in Modoc County. Modoc 299 Caldwell Creek Rehab. Pavement Project Pavement 7/30/2018 CONSTRUCTION
0216000159 2 Siskiyou 3/ 5 $1.2 million bridge project will revamp six bridges on State Route 3 and Interstate 5 in Siskiyou County. Siskiyou 3 & 5 Bridges Project Bridges 7/16/2018 COMPLETED
0318000074 3 Placer/ Nevada/ Sierra 80 $16 million project will widen striping and increase visibility on 272 lane miles of Interstate 80 from east of I-80/SR-174 Separation in Placer County to the California/Nevada State line. Placer, Nevada & Sierra 80 Striping Project Striping 7/17/2018 COMPLETED
0416000341 4 Alameda 24/ 80/ 580/ 880/ 980 $5.2 million bridge project will revamp 26 bridges on State Route 24 and Interstates 80, 580, 880 and 980 in Alameda County. Alameda Bridges Project Bridges 7/20/2018 CONSTRUCTION
0517000071 5 San Benito 101 $1.4 million pavement project will improve 4.54 lane miles of U.S. Highway 101 at State Route 129 and Betabel Road interchanges in San Benito County. San Benito 101 Pavement Project Pavement 7/1/2018 COMPLETED
1018000042 10 Merced 99 $2.8 million project will widen striping and increase visibility on 116 lane miles of State Route 99 from the Merced/Madera County line to Owens Creek Bridge in Merced County, and from Webber Canal Bridge to north of Bradbury Road Overcrossing in Merced County. Merced 99 Striping Project Striping 7/15/2018 COMPLETED
0217000061 2 Tehama 5 $12.7 million pavement project will improve 89.6 lane miles of Interstate 5 from the Glenn/Tehama County line to north of Branch Coyote Creek near the city of Red Bluff in Tehama County. Tehama 32 Red Bluff Overlay Pavement Project Pavement 3/21/2018 COMPLETED
0316000240 3 El Dorado 50 $6.9 million pavement project will improve 41 lane miles of U.S. Highway 50 from Sawmill Road Undercrossing to the South Fork American River Bridge east of the city of Placerville in El Dorado County. El Dorado 50 RHMA Overlay Pavement Project Pavement 7/9/2018 COMPLETED
0416000267 4 Santa Clara 9/ 17/ 82/ 85/ 87/ 101/ 152 $2.4 million bridge project will revamp 32 bridges on U.S. Highway 101 and State Routes 9, 17, 82, 85, 87 and 152 in Santa Clara County. Santa Clara Bridges Project Bridges 7/20/2018 CONSTRUCTION
0417000186 4 Sonoma 116 $3.4 million pavement project will improve 7.5 lane miles of State Route 116 from Mill Station Road to east of Cooper Road in the city of Sebastopol in Sonoma County. Sonoma 116 Pavement Project Pavement 7/31/2018 COMPLETED
0716000157 7 Los Angeles 14 $2.6 million pavement project will improve 19.2 lane miles of State Route 14 between Newhall Avenue and Friendly Valley Parkway in Los Angeles County. Los Angeles 14 Pavement Project Pavement 7/2/2018 COMPLETED
1017000067 10 San Joaquin 12 $1.5 million pavement project will improve 7.33 lane miles of State Route 12 from east of North Guild Avenue to Bruella Road near the city of Lodi in San Joaquin County. San Joaquin 12 Pavement Project Pavement 7/16/2018 COMPLETED
0417000190 4 Santa Clara 85 $5.4 million pavement project will improve 16.8 lane miles of State Route 85 from U.S. Highway 101 in the city of San Jose to Winfield Boulevard in Santa Clara County. Santa Clara 85 Pavement Project Pavement 7/28/2018 COMPLETED
0713000078 7 Los Angeles 47 $1.1 million pavement preservation project will improve 6 lane miles of State Route 47 between MacArthur Avenue and Seaside Avenue in Los Angeles County. Los Angeles 47 Pavement Project Pavement 6/28/2018 COMPLETED
0217000069 2 Shasta 299 $4 million pavement project will improve 19.7 lane miles of State Route 299 from east of Boulder Drive to east of Hootenanny Lane in the city of Redding in Shasta County. Shasta 299 College Overlay Pavement Project Pavement 8/13/2018 COMPLETED
0218000023 2 Shasta/ Siskiyou/ Tehama 5/ 5/ 99 & 5 $6.3 million project will widen striping and increase visibility on 668 lane miles of State Route 99 and Interstate 5 at various locations in the counties of Tehama, Shasta and Siskiyou. Shasta, Siskiyou & Tehama 5 & 99 Striping Project Striping 6/1/2019 PROJECT APPROVED
0418000180 4 Santa Clara 85 $1.5 million striping project on State Route 85 from north of Winchester Boulevard to south of Steven Creek Boulevard Overcrossing in Santa Clara County. Santa Clara 85 Striping Project Striping 7/29/2018 COMPLETED
0817000104 8 San Bernardino 62, 247 $3.7 million pavement project will repair 59.4 lane miles of State Route 62 from west of Iron Mountain Pump Road to west of Rice Midland Road in San Bernardino County, and SR-247 from south of Midway Avenue to north of Haynes Road in Lucerne Valley in San Bernardino County. San Bernardino 62 & 247 Pavement Project Pavement 7/15/2018 COMPLETED
0818000029 8 Riverside/ San Bernardino 10 $15.1 million project will widen striping and increase visibility on 711 lane miles of Interstate 10 from I-10/I-15 Junction in San Bernardino County to the California/Arizona State line. Riverside & San Bernardino 10 Striping Project Striping 7/27/2018 CONSTRUCTION
0416000270 4 San Francisco 101 $1 million bridge project will revamp four bridges on U.S. Highway 101 in San Francisco County. San Francisco 101 Bridges Project Bridges 8/14/2018 COMPLETED
0517000077 5 San Luis Obispo 41 $4.8 million pavement preservation project will improve 9.32 lane miles of State Route 41 from Los Altos Road to El Camino Real in the city of Atascadero in San Luis Obispo County. San Luis Obispo 41 Atascadero RHMA Pavement Project Pavement 8/1/2018 COMPLETED
0713000080 7 Los Angeles 710 $2 million pavement project will improve 11.4 lane miles of Interstate 710 from south of Pico Avenue to south of I-710/State Route 1 Separation in the city of Long Beach. Los Angeles 710 Pavement Project Pavement 6/29/2018 CONSTRUCTION
1013000078 10 Mariposa 140 $4.1 million pavement replacement project will improve 6.4 lane miles of State Route 140 from SR-49/SR-140 Junction to Whitlock Road in Mariposa County. Mariposa 140 Midpines CAPM Pavement Project Pavement 8/15/2018 COMPLETED
0918000008 9 Inyo/ Mono 395, 6 $5.3 million pavement preservation project will improve 33.4 lane miles of U.S. Highways 395 and 6 at various locations in the counties of Inyo and Mono. Inyo & Mono 395 & 6 Pavement Project Pavement 9/4/2018 COMPLETED
0717000172 7 Los Angeles 5 $31.5 million traffic management systems project will repair ramp metering system and detection system elements on Interstate 5 at various locations in Los Angeles County. Los Angeles 5 Mobility Project Mobility 7/27/2018 CONSTRUCTION
0717000173 7 Los Angeles 10 $21.5 million traffic management systems project will repair ramp metering system elements and vehicle detection system elements on Interstate 10 at various locations in Los Angeles County. Los Angeles 10 Mobility Project Mobility 7/29/2018 CONSTRUCTION
0318000049 3 Sacramento/ Yolo/ Colusa/ Glenn 5 & 50/ 5 & 50/ 5/ 5 $8.2 million project will widen striping and increase visibility on 431 lane miles of Interstate 5 at various locations in the counties of Sacramento, Yolo, Colusa and Glenn. Sacramento, Yolo, Colusa & Glenn 5 Striping Project Striping 8/3/2018 COMPLETED
0717000092 7 Ventura 23, 101 $2.5 million pavement project will improve 3.5 lane miles of State Routes 23 and U.S. Highway 101 between the cities of Moorpark and Thousand Oaks. Ventura 23 & 101 Pavement Project Pavement 7/19/2018 CONSTRUCTION
0418000112 4 San Francisco/ San Mateo/ Santa Clara 101 $9.2 million project will widen striping and increase visibility on 630 lane miles of U.S. Highway 101 at various locations in the counties of San Francisco, San Mateo and Santa Clara. San Francisco, San Mateo & Santa Clara 101 Striping Project Striping 9/5/2018 CONSTRUCTION
1117000196 11 Imperial 98/ 111 $193 thousand bridge project will provide erosion control and revamp five bridges on State Routes 98 and 111 in Imperial County. Imperial 98 & 111 Bridges Project Bridges 5/15/2018 CONSTRUCTION
0616000243 6 Fresno 168 $25.6 million drainage and pavement preservation project will repair culverts and improve 40.2 lane miles of State Route 168 from west of Auberry Road to Kaiser Pass Road in Fresno County. Fresno 168 Drainage & Paving Preservation CAPM Project Bridges 10/10/2018 CONSTRUCTION
0118000133 1 Mendocino 20 $817,400 bridge preservation project will revamp the Russian River Bridge on State Route 20 near the town of Calpella in Mendocino County. Fresno 168 Drainage & Paving Preservation CAPM Project Mendocino 20 Russian River BOH Deck Preservation Project 10/17/2018 CONSTRUCTION
1117000155 11 Imperial 111/ 98 $20.2 million project will improve 44 lane miles of State Routes 111 from State Route 98 to Ross Avenue near the city of Calexico, and SR-98 from Rockwood Avenue to east of Cole Road in Imperial County. Imperial 111 & 98 RHMA Overlay Pavement Project Pavement 5/14/2018 CONSTRUCTION
0416000276 4 San Mateo 1/ 101/ 280 $2.7 million bridge project will revamp nine bridges on State Route 1, U.S. Highway 101 and Interstate 280 in San Mateo County. San Mateo 1, 101 & 280 Bridges Project Bridges 7/25/2018 CONSTRUCTION
0618000223 6 Fresno 68/180 $3.4 million project will widen striping and increase visibility on 149 lane miles of State Route 168 from south of East Floradora Avenue in the city of Fresno to East Shepherd Avenue in the city of Clovis in Fresno County, and SR-180 from South Brawley Avenue in the city of Fresno to west of East Kings Canyon Road Intersection in the city of Sanger in Fresno County. Fresno 168 & 180 Striping Project Striping 4/26/2019 PROJECT APPROVED
0618000224 6 Kern 46/58 $2.8 million project will widen striping and increase visibility on 136 lane miles of State Route 46 from the San Luis Obispo/Kern County line to Kecks Road in the town of Lost Hills in Kern County, from east of Bitterwater Valley Road in the town of Lost Hills to west of Brown Material Road in Kern County and from east of Scofield Avenue in the city of Wasco to SR-46/SR-99 Separation in the city of McFarland in Kern County, and SR-58 from east of SR-184 in the city of Bakersfield to east of Bealville Road in the town of Keene in Kern County. Kern 46 & 58 Striping Project Striping 3/29/2019 PROJECT APPROVED
0616000181 6 Fresno/ Madera 99 $6.6 million bridge project will revamp 16 bridges on State Route 99 in the counties of Fresno and Madera. Fresno & Madera 99 Bridges Project Bridges CONSTRUCTION
0414000446 4 Marin 101 $13 million traffic management systems project will install ramp metering and Traffic Operations System (TOS) elements along U.S. Highway 101 from north of Golden Gate Bridge near the city of Sausalito to north of Sir Francis Drake Boulevard in the city of Larkspur in Marin County. Marin 101 Install Ramp Metering & TOS Elements Project Mobility 1/15/2019 PROJECT APPROVED
0612000157 6 Tulare 201/216 $18.4 million bridge project will replace bridge rail and widen the Sand Creek Bridge and the Friant-Kern Canal Bridge on State Route 201 near the city of Kingsburg in Tulare County, and the Kaweah River Bridge on SR-216 in Tulare County. Tulare 201 & 206 Bridge Widening & Rail Replacement Projec Bridges 1/21/2019 PROJECT APPROVED
0513000009 5 Monterey 101 $53.7 million pavement preservation project will upgrade guardrail and improve 17.7 lane miles of U.S. Highway 101 from East Market Street to south of Russell/Espinosa Road in the city of Salinas in Monterey County. Monterey 101 Salinas Pavement Rehab. Project Pavement 1/30/2019 PROJECT APPROVED
0414000305 4 Alameda 680 $40.4 million traffic management systems project will install ramp meters, ramp carpool bypass lanes and traffic operations systems along Interstate 680 from Scott Creek Road to Alcosta Boulevard near the cities of Fremont, Pleasanton and Dublin. Alameda 680 Ramp Metering Mobility Project Mobility 1/30/2019 PROJECT APPROVED
0413000097 4 Alameda 238/580 $10.9 million bridge project will revamp the East Connector Bridge on Interstate 238 in the city of Hayward, the north I-238/south I-880 Connector Bridge in the town of San Lorenzo, and the Arroyo Seco Bridge on I-580 in Alameda County. Alameda 238 & 580 Bridge Preservation Project Bridges 1/30/2019 PROJECT APPROVED
0413000058 4 Alameda 880 $9.9 million bridge project will revamp the Crandall Creek Bridge on Interstate 880 in the city of Fremont in Alameda County. Alameda 880 Seismic Retrofit Project Bridge 1/30/2019 PROJECT APPROVED
0618000079 6 Kern 99 $2.9 million project will widen striping and increase visibility on 197 lane miles of State Route 99 at various locations in Kern County. Kern 99 Striping Project Striping 3/19/2018 COMPLETED
1117000080 11 San Diego 79 $1.6 million bridge project will replace two bridge decks on State Route 79 near Warner Springs in San Diego County. San Diego 79 Bridges Project Bridges 7/15/2018 PROJECT APPROVED
0116000074 1 Humboldt 101 $2.6 million pavement project will improve 20.2 lane miles of U.S. Highway 101 from north of Myers Flat to Newton Road in Humboldt County. Humboldt 101 Weott RHMA Pavement Project Pavement 9/1/2018 PROJECT APPROVED
0717000218 7 Ventura 101 $1.2 million bridge project will revamp a bridge on U.S. Highway 101 in Ventura County. Ventura 101 Bridge Project Bridge 10/1/2018 PROJECT APPROVED
0718000056 7 Los Angeles/ Ventura 101 $14.2 million project will widen striping and increase visibility on 268 lane miles of U.S. Highway 101 at various locations from North Mission Road in Los Angeles County to the Los Angeles/Ventura County line, and from the Los Angeles/Ventura County line to the Ventura/Santa Barbara County line. Los Angeles & Ventura 101 Striping Project Striping 6/26/2018 CONSTRUCTION
1116000146 11 Imperial 8/ 86/ 98/ 111/ 186 $1.5 million bridge project will revamp 17 bridges on Interstate 8 and State Routes 86, 98, 11 and 186 in Imperial County. Imperial 8, 86, 98, 111 & 186 Bridges Project Bridges 10/1/2018 COMPLETED
1117000215 11 San Diego 805 $24.9 million bridge project will widen the Sweetwater River Bridge on Interstate 805 in the city of Chula Vista, and repair shoulders, joint seals, approach slabs, upgrade bridge rails on I-805 from south of Sweetwater River Bridge to State Route 54 in National City in San Diego County. San Diego 805 Sweetwater Bridge Upgrade Project Bridges 3/20/2018 CONSTRUCTION
0300001109 3 Yolo & Sacramento 80 $12.5 million project will install ramp meters along Interstate 80 at various locations in the counties of Yolo and Sacramento. Yolo & Sacramento Install Ramp Meters Mobility Project Mobility 11/8/2018 CONSTRUCTION
0214000022 2 Shasta 5 $12.6 million bridge project will revamp Pitt River Bridge Overhead on Interstate 5 in Shasta County. Shasta 5 Pit River Deck Improvements Bridge Project Bridge 9/28/2018 CONSTRUCTION
0200020160 2 Shasta 299 $19.2 million pavement preservation project will improve 21 lane miles of State Route 299 from west of Crystal Creek Road to Trinity Alley near the town of Shasta. Shasta 299 Pavement Project Pavement 5/1/2019 PROJECT APPROVED
1117000158 11 Imperial 86 $5.3 million project will improve 32 lane miles of State Route 86 from I Street to Brandt Road near the city of Brawley, and from south of B Street to Martin Road near the city of Westmorland in Imperial County. Imperial 86 Pavement Project Pavement 6/25/2018 CONSTRUCTION
0218000024 2 Shasta 5 $44.4 million pavement preservation project will improve 6.4 lane miles, update signage and lighting, and add Intelligent Transportation System elements on Interstate 5 from I-5/SR-273 Separation in the city of Anderson to the Sacramento River Bridge in Shasta County. Shasta 5 Big Southern Pavement Project Pavement 1/2/2019 CONSTRUCTION
0212000072 2 Modoc 299 $10.8 million bridge project will replace the Butte Creek Bridge on State Route 299 in the town of Adin, and the Ash Creek Bridge on SR-299 in Modoc County. Modoc 299 Butte & Ash Creek Bridge Replacement Bridges 4/1/2019 PROJECT APPROVED
0218000100 2 Siskiyou 97 $1.9 million pavement project will improve 16.4 lane miles of U.S. Highway 97 from Yellow Butte Road in the city of Montague to north of Deer Mountain Road in the city of Weed in Siskiyou County. Siskiyou 97 Mill & Fill Project Pavement 6/1/2019 PROJECT APPROVED
0212000071 2 Shasta 44 $9.8 million bridge project will replace the Hat Creek Bridge on State Route 44 in the town of Old Station in Shasta County. Shasta 44 Hat Creek Bridge Replacement Project Bridge 4/1/2019 PROJECT APPROVED
0318000109 3 Placer 80 $5.5 million pavement project will improve 30 lane miles of Interstate 80 from Sierra College Boulevard in the city of Rocklin to Penryn Rock Springs Undercrossing in the town of Penryn in Placer County. Placer 80 Cold Plane & RHMA Overlay Project Bridge 4/1/2019 PROJECT APPROVED
0318000159 3 Colusa 20 $2.3 million pavement project will improve 9 lane miles of State Route 20 from east of Husted Road in the city of Williams to west of Hunter Road in the city of Colusa in Colusa County. Colusa 20 RHMA Overlay Project Pavement 4/1/2019 PROJECT APPROVED
0318000119 3 Glenn 162 $673,000 drainage project will repair and replace culverts along State Route 162 from west of the Col-Canal Bridge to east of County Road 302 in the city of Willows in Glenn County. Glenn 162 Thunderhills Repair & Replace Culverts Project Drainage/ Culverts 4/1/2019 PROJECT APPROVED
0317000331 3 El Dorado/ Placer 50/65 $644,000 bridge project will revamp bridges on U.S. Highway 50 at various locations in El Dorado County, and on State Route 65 at various locations in Placer County. El Dorado & Placer 50 & 65 Treat Decks Project Bridge 4/2/2019 PROJECT APPROVED
0318000169 3 Colusa/Sutter/Yuba 20 $2.7 million project will widen striping and increase visibility on 176 lane miles of State Route 20 at various locations in the counties of Colusa, Sutter and Yuba. Colusa, Sutter & Yuba 20 Striping Project Striping 4/1/2019 PROJECT APPROVED
0718000058 7 Los Angeles 5 $15.4 million project will widen striping and increase visibility on 687 lane miles of Interstate 5 from the Los Angeles/Orange County line to the Los Angeles/Kern County line. Los Angeles 5 Striping Project Striping 11/1/2018 CONSTRUCTION
1115000038 11 San Diego 805 $10.7 million pavement preservation project will improve 14.4 lane miles of Interstate 805 from Mira Mesa Boulevard Undercrossing to north of I-5/I-805 separation in the city of San Diego. San Diego 805 Pavement Project Pavement 11/21/2018 CONSTRUCTION
0300020594 3 Yuba 20 $17.4 million pavement preservation project will widen shoulders, realign travel way and improve 4.4 lane miles of State Route 20 from east of Loma Rica Road to west of Spring Valley Road in the city of Marysville in Yuba County. Yuba 20 Loma Rica Road/ Spring Valley Road Widening & Rehab. Project Pavement 12/10/2018 CONSTRUCTION
1018000077 10 San Joaquin 12 $3.8 million bridge project will improve truck carrying capacity and freight movement on Interstate 5 at the Mathews Road Undercrossing near the city of Lathrop in San Joaquin County. San Joaquin 5 Bridge Preventive Maintenance Bridge 11/26/2018 CONSTRUCTION
0714000020 7 Los Angeles 10/1 $47.2 million pavement preservation project will upgrade guardrail, crash cushions, Americans with Disabilities Act (ADA) curb ramps and improve 98.9 lane miles of Interstate 10 from State Route 1 to I-5/U.S. Highway 101 Interchange in Los Angeles County, and SR-1 from McClure Tunnel to Lincoln Boulevard in the city of Santa Monica in Los Angeles County. Los Angeles 10 & 1 Slab Replacement, Cold Plane Pavement Project Bridge 12/12/2018 CONSTRUCTION
0512000135 5 San Luis Obispo 101 $19 million pavement preservation project will improve 26 lane miles of State Route 17 from north of Santa's Village Road in the city of Scotts Valley to the Santa Cruz/Santa Clara County line. Santa Cruz 17 CAPM Pavement Project Pavement 12/17/2018 PROJECT APPROVED
0514000051 5 Santa Cruz 101 $5.8 million bridge project will revamp the Pismo Creek Bridge on U.S. Highway 101 in the city of Pismo Beach in San Luis Obispo County. San Luis Obispo 101 Pismo Creek Bridge Project Bridge 12/15/2018 CONSTRUCTION
0614000009 6 Kern 58 $27 million pavement replacement project will improve 10.4 lane miles of State Route 58 from SR-99/SR-58 Separation to Cottonwood Road in Kern County. Kern 58 Pavement Project Pavement 2/1/2019 CONSTRUCTION
1115000060 11 San Diego 15/56 $6.4 million traffic management systems project will replace Changeable Message Signs (CMS) panels with Advanced Variable Message Signs (AVMS) panels at various locations along Interstate 15 and State Routes 56 in San Diego County. San Diego 5 & 56 Replace Existing CMS Panels Project Mobility 2/4/2019 PROJECT APPROVED
1115000036 11 San Diego 52 $18.4 million pavement preservation project will improve 26.4 lane miles of State Route 52 from Interstate 805 to east of Santo Road in the city of San Diego. San Diego 52 Pavement Project Pavement 12/11/2018 PROJECT APPROVED
1213000143 12 Orange 5 $4.9 million traffic management systems project will upgrade existing fiber optic communication system, closed circuit television and electronic equipment on Interstate 5 from State Route 133 to SR-55 in the cities of Santa Ana, Tustin and Irvine. Orange 5 Traffic Management Systems Mobility Project Mobility 10/22/2018 CONSTRUCTION
0812000124 8 San Bernardino 10 $5.1 million bridge project will replace bridge rail at the City Creek Bridge and East Fork City Creek Bridge on State Route 330 near the city of Highland in San Bernardino County. San Bernardino 10 Pavement Project Bridges 2/1/2019 PROJECT APPROVED
0617000225 6 Kern 5 $5 million project will widen the California Aqueduct on Interstate 5 in the town of Lebec (north of the Grapevine) in Kern County to meet standard truck load capacity. Kern 5 Freight Corridor California Aqueduct Bridge Project Bridges 2/4/2019 PROJECT APPROVED
0718000113 7 Ventura 33 $1.7 million pavement preservation project will improve 11 lane miles of State Route 33 from south of Parkview Drive in the city of Ventura to Baldwin Road/SR-150 in the city of Ojai in Ventura County. Ventura 33 Digouts, Slurry Seal & Shoulder Backing Project Pavement 2/1/2019 PROJECT APPROVED
0718000114 7 Ventura 33 $2.6 million pavement preservation project will improve 21 lane miles of State Route 118 from west of SR-118/SR-126 Separation in the city of Ventura to east of Donlon Road/SR-34 in the town of Somis in Ventura County. Ventura 118 Slurry Seal Project Pavement 2/1/2019 PROJECT APPROVED
0717000107 7 Los Angeles 126 $1.6 million pavement preservation project will improve 30 lane miles of State Route 126 from the Los Angeles/Ventura County line to SR-126/Interstate 5 Separation in the city of Santa Clarita in Los Angeles County. Los Angeles 126 Slurry Seal Project Pavement 2/1/2019 PROJECT APPROVED
0718000129 7 Los Angeles 91/110 $1 million drainage project will repair and replace culverts along State Route 91 from west of Pioneer Boulevard in the city of Artesia to east of Norwalk Boulevard in the city of Cerritos in Los Angeles County, and Interstate 110 from south of I-110/John S. Gibson Boulevard Junction in the city of Los Angeles to West Carson Street in the city of Carson in Los Angeles County. Los Angeles 91 & 110 Line & Repair Culverts Project Drainage/ Culverts 2/1/2019 PROJECT APPROVED
0814000114 8 San Bernardino 142 $9.8 million pavement preservation project will upgrade guardrail and improve 14 lane miles of State Route 142 from the San Bernardino/Orange County line to SR-71 in the city of Chino Hills in San Bernardino County. San Bernardino 142 Chino Hills CAPM Pavement Project Pavement 12/1/2018 PROJECT APPROVED
0717000174 7 Los Angeles/ Ventua 2, 5, 10, 57, 60, 71, 91, 101, 105, 110, 118, 134, 170, 210, 405, 405, 605, 605 & 710/ 118 $26.1 million traffic management systems project will repair Ramp Metering Systems (RMP) and Vehicle Detection Systems (VDS) at various locations along State Route 2, Interstate 5, I-10, SR-57, SR-60, SR-71, SR-91, U.S. Highway 101, I-105, 1-110, SR-118, SR-134, SR-170, I-210, I-405, I-605 & I-710 in Los Angeles County, and SR-118 in Ventura County. Los Angeles & Ventura Intelligent Transportation System Repair & Restoration Project Mobility 3/15/2019 CONSTRUCTION
0714000007 7 Ventura 23 $7.7 million pavement preservation project will upgrade curb ramps to Americans with Disabilities standards and improve 10.3 lane miles of State Route 23 from Carlisle Road to U.S. Highway 101 Junction in the city of Thousand Oaks in Ventura County. Ventura 23 Cold Plane & Overlay AC Pavement Project Pavement 2/5/2019 CONSTRUCTION
0815000059 8 Riverside 10, 60 & 86 $4.7 million project will install four changeable message signs along Interstate 10 in Riverside County. Crews will also install one changeable message sign on State Route 60 in Moreno Valley, and one changeable message sign on SR-86 in Coachella. Riverside 10, 60 & 86 Install Changeable Message Signs Mobility Project Mobility 3/4/2019 CONSTRUCTION
0714000105 7 Los Angeles 110 $9.3 million bridge project will revamp the Los Angeles River Bridge on State Route 110 in the city of Los Angeles in Los Angeles County. Los Angeles 110 LA River Bridge Project Bridges 1/15/2019 CONSTRUCTION
0417000499 4 Santa Clara 152 $2.8 million pavement project will repair and replace 8.4 lane miles of State Route 152 from Santa Cruz/Santa Clara County line to Rancho Vista Drive in the city of Gilroy in Santa Clara County. Santa Clara 152 Mill & Replace with RHMA Overlay Project Pavement 3/21/2019 PROJECT APPROVED
0417000187 4 Santa Clara 9 $2 million pavement project will improve 7.8 lane miles of State Route 9 from Skyline Boulevard in the town of Los Gatos to south of Sanborn Road in the city of Saratoga, and at Big Basin Way in the city of Saratoga in Santa Clara County. Santa Clara 9 Rubberized Bonded Project Pavement 3/30/2019 PROJECT APPROVED
0200000586 2 Siskiyou 263/6 $22.9 million bridge project will replace Klamath Bridge on State Route 263 from north of Shasta River Bridge to SR-96 near the city of Yreka, and SR-96 east of SR-263 in Siskiyou County. Siskiyou 263 Klamath River Bridge Bridge 1/20/2019 PROJECT APPROVED
0417000519 4 Santa Clara 82 $9.8 million pavement preservation project will improve 22.1 lane miles of State Route 82 (El Camino Real) from Portola Avenue to Lawrence Expressway Overcrossing in the city of Santa Clara in Santa Clara County. Santa Clara 82 Pavement Rehabilitation Project Pavement 4/15/2019 PROJECT APPROVED
1018000145 10 Mariposa 140 $209,900 drainage project will replace culverts along State Route 140 at Incline Road in Mariposa County. Mariposa 140 Replace Culverts Projec Drainage/ Culverts 4/15/2019 PROJECT APPROVED
0615000231 6 Tulare 99 $3.7 million pavement project will improve 29 lane miles of State Route 99 from north of Avenue 280 Overcrossing in the city of Visalia to north of Goshen Overhead near the community of Goshen in Tulare County. Tulare 99 Pavement Project Pavement 4/22/2019 PROJECT APPROVED
0617000222 6 Kern 5/ 99 $11.4 million bridge project will lower the Interstate 5/State Route 99 Separation Bridge near the Grapevine and Wheeler Ridge in Kern County to meet vertical clearance standards, and provide greater truck and freight movement. Kern 5/99 Fast Freight Corridor Bridge Project Bridge 3/15/2019 PROJECT APPROVED
1013000053 10 San Joaquin/Stanislaus 99 $23.6 million bridge project will replace sections of the Stanislaus River Bridge on State Route 99 in the counties of San Joaquin and Stanislaus. San Joaquin & Stanislaus 99 Bridge Replacement Project Bridge 5/1/2019 PROJECT APPROVED
1018000196 10 Merced 152 $4.4 million project will widen striping and increase visibility on 173 lane miles of State Route 152 from the Santa Clara/Merced County line to the Merced/Madera County line. Merced 152 Striping Project Striping 5/1/2019 PROJECT APPROVED
1018000195 10 San Joaquin 12/120/205 $5.1 million project will widen striping and increase visibility on 184 lane miles of State Route 12 from east of West Terminous Drive to SR-99/SR-12 Separation in the city of Lodi and from Bruella Road to SR-88 Junction in the city of Lodi in San Joaquin County, SR-120 from Interstate 5/SR-120 Separation in the city of Lathrop to west of Plaza Avenue in the city of Escalon in San Joaquin County, Interstate 205 from the Alameda/San Joaquin County line to Harlan Road in the city of Lathrop in San Joaquin County, and east of Hansen Road to west of Grant Line Road in the city of Tracy in San Joaquin County. San Joaquin 12, 120 & 205 Striping Project Striping 5/1/2019 PROJECT APPROVED
1012000055 10 Merced/Stanislaus 152 & 5/5 $31.3 million bridge project will revamp various sections of the California Aqueduct Bridge on State Route 152 and Interstate 5 in Merced County and I-5 in Stanislaus County. Merced & Stanislaus California Aqueduct Bridge Seismic Retrofit Project Bridges 5/10/2019 PROJECT APPROVED
1018000148 10 Merced 59/140 $386,928 drainage project will replace culverts along State Route 59 north of Freitas Avenue and near the Merced River Bridge in the city of Merced in Merced County, and SR-140 south of Los Banos Creek in the city of Gustine and north of Le Grand Canal in the town of Le Grand in Merced County. Merced 59 & 140 Replace Culverts Project Drainage/ Culverts 5/15/2019 PROJECT APPROVED
0915000042 9 Inyo 395 $8.9 million pavement replacement project will improve 11.5 lane miles of U.S. Highway 395 from south of State Route 136 to East Inyo Street, and SR-136 at the US-395 intersection in Lone Pine. Inyo 395 South Lone Pine CAPM Pavement Project Pavement 6/1/2019 PROJECT APPROVED
0114000107 1 Mendocino 128 $21.2 million pavement project will add a tapered shoulder edge to enhance safety and improve 35.7 lane miles of State Route 128 from SR-1 Junction in the town of Albion to east of Indian Creek Bridge (south of Tumbling McD Road) in the town of Boonville in Mendocino County. Mendocino 128 Flynn Creek CAPM Pavement Project & Tapered Shoulder Edge Pavement 4/15/2019 PROJECT APPROVED
1018000165 10 Merced 5 $10.9 million pavement project will improve 68 lane miles of Interstate 5 from the Fresno/Merced County line to north of Billy Wright Road in the city of Gustine in Merced County. Merced 5 Pavement Project Pavement 4/15/2019 PROJECT APPROVED
1018000151 10 Calaveras 12/ 26 $230,000 drainage project will replace culverts along State Route 12 south of Sawmill Street in the town of Valley Springs in Calaveras County, and SR-26 from Church Street to west of Lafayette Street in the town of Mokelumne Hill in Calaveras County and north of Pine Street/Bald Mountain Road in the town of West Point in Calaveras County. Calaveras 12 & 26 Replace Culverts Project Drainage/ Culverts 5/15/2019/td> PROJECT APPROVED
0817000216 8 San Bernardino 10 $91.8 million pavement preservation project will improve ramps and 48 lane miles of Interstate 10 from the San Bernardino/Los Angeles County line to I-10/I-15 Separation in San Bernardino County. San Bernardino 10 Pavement Project Pavement 7/12/2019 PROJECT APPROVED
0817000221 8 Riverside 10 $5.4 million pavement preservation project will improve 132 lane miles of Interstate 10 from Rice Road in the community of Desert Center to Wiley's Well Road in the city of Blythe in Riverside County. Riverside 10 Pavement Rehabilitation Project Pavement 3/1/2019 PROJECT APPROVED
0717000127 7 Los Angeles 1 $2.8 million pavement project will improve 30 lane miles of State Route 1 from Trancas Canyon Road in the city of Malibu to the Los Angeles/Ventura County line. Los Angeles 1 Slurry, Digouts & Shoulder Work Project Pavement 9/1/2019 PROJECT APPROVED